• 9089 South 1300 West Suite 160 West Jordan, UT 84088 info@perigeecivil.com

Mallard Bay Development

Saratoga Springs, UT

Mallard Bay Development

  • Mallard Bay
  • Mallard Bay
  • Mallard Bay

Services Provided:

  • Feasibility
  • Sewer modeling and master planning
  • Storm drain modeling
  • Roadway, site, and utility design
  • State highway widening
  • Platting and entitlement
  • Construction staking
Mallard Bay Development

Perigee provided engineering and surveying for the single family residential development. Design included adhering to sewer special assessment area requirements.

Project Statistics:
  • 179 residential lots, in 9 phases
  • 75 acres
  • Sewer lift station
  • 2 miles of roadway
  • 1 mile of pedestrian and bike trails
  • 2 miles of sewer, water, and secondary water